Home » News » Industry Dynamics » How to Properly Install Cable Terminations?

How to Properly Install Cable Terminations?

Views: 0     Author: Site Editor     Publish Time: 2025-08-08      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Ever wondered why some cables fail unexpectedly? Poor terminations are often the culprit.Choosing the right method boosts safety and performance. Each application needs a specific approach.In this guide, you'll learn key termination types. We'll cover step-by-step installation and expert tips.


What Are Electrical Cable Terminations?


Definition and Purpose 

Cable terminations are points where cable sections connect to form continuous lines. They do more than just join conductors—they provide electrical continuity, insulation protection, and environmental sealing. They also reduce stress on the cable and prevent faults.

Types of Cable Terminations

By Location:

o Intermediate splices – join cables in the middle of a line

o Terminal heads – end points of a cable

By Material & Method:

o Heat shrink – uses heat to seal and insulate

o Cold shrink – pre-stretched, quick and flame-free

o Epoxy resin – rigid, permanent

o Dry wrap – flexible, tape-based protection

By Conductor Type:

o Copper vs. aluminum

o Single-core vs. multi-core

By Voltage Rating:

o Low voltage: 1 kV

o Medium voltage: 1–35 kV

o High voltage: up to 220 kV


Choosing the Right Cable Termination Method


Factors to Consider

· Cable type: copper, aluminum, or fiber optic

· Operating environment: indoor, outdoor, harsh conditions

· Future access: permanent vs. removable

· Installer skill: some methods need experience

Comparing Termination Methods

Method

Best For

Pros

Cons

Connectors

Quick maintenance

Easy, reusable

Less secure under vibration

Soldering

High reliability

Strong, vibration-resistant

Needs skill, permanent

Crimping

Network/coaxial cables

Fast, no heat

Poor crimps cause failures

Screw Terminals

Simple electrical systems

Tool-free, easy

Can loosen over time

Fusion Splicing

Fiber optics

Low signal loss

Expensive, permanent

Heat Shrink

Outdoor/harsh environments

Weatherproof

Permanent, needs heat gun

Cold Shrink

High-voltage networks

Flame-free, fast

Higher cost


Step-by-Step Guide: How to Install Cable Terminations Properly


Pre-Installation Preparation

· Tools: crimpers, heat gun, strippers, multimeter

· Safety: de-energize cables, wear PPE

· Measure & cut cables correctly to avoid errors

Termination Installation Steps

Strip the Cable

o Remove outer jacket carefully

o Expose conductor length according to termination type

Prepare the Termination

o Pick the right size using conductor diameter

o Clean conductors to remove oxidation

Secure the Termination

Crimping: even pressure, proper tool

Soldering: apply flux, heat evenly

Heat shrink: torch at 110–140°C

Cold shrink: slide pre-expanded tube, remove liner

Insulate and Protect

o Seal with tape, epoxy, or sleeves

o Check for gaps

Post-Installation Testing

· Measure insulation resistance using a megohmmeter

· Conduct continuity and partial discharge tests

· Inspect for cracks or loose connections


Cold Shrink vs. Heat Shrink Terminations


Feature

Cold Shrink

Heat Shrink

Pros

No flame, fast, high voltage ready

Affordable, widely available

Cons

Higher cost, limited reusability

Needs heat source, skill

Best For

Utility networks, harsh environments

DIY projects, industrial use


Common Mistakes & How to Avoid Them


· Loose Connections: under-crimping or weak soldering

· Insulation Damage: over-stripping or overheating

· Wrong Termination Type: mismatched voltage or conductor

· Skipping Testing: can hide faults and reduce safety


Conclusion


Proper cable termination involves choosing the correct type, preparing the cable carefully, and installing it correctly. Testing after installation ensures insulation integrity, electrical continuity, and reliable connections. Using the right method prevents faults, loose joints, or insulation damage. High-voltage or complex projects carry risks, so professional installation is essential. Always consult a certified electrician for challenging or high-risk applications to guarantee safety and long-term performance.

 

 


ABOUT US

Our company is a professional company that engaged in production, sales, technology research, technology development and technical services of electrical system products, power engineering design and construction, electrical products, electrical equipment, sales, installation and technical services of energy storage equipment.

QUICK LINKS

PRODUCTS

CONTACT US

  2201-7&2201-8, Dongjiu Building, No.888 Jiefang East Road, Yixing City, Jiangsu Province
  Room A, 7/F, On Kin Industrial Building,
22 Wang Hoi Road, Yuen Long,
New Territories, Hong Kong
  +86-18761555908
  +852 8496 0208
  +86-510-87015096
   +86-18020528228/+86-18761555908
​Copyright ©  2025 East Energy Electrical Engineering Co., Ltd.  苏ICP备16064163号-1 Technology by Leadong. Sitemap.